Skip To Main Content

Lebanon Valley College Athletics

Lebanon Valley College Athletics, go to homepage

Schedule

Events

Schedule
All Events
Sorrell Long controlling ball
Emily Reaman
4
Winner Lebanon Valley LEBANON (4-6, 1-1)
0
Hood HOOD (3-7, 0-3)
Winner
Lebanon Valley LEBANON
(4-6, 1-1)
4
Final
0
Hood HOOD
(3-7, 0-3)
Score By Periods
Team 1 2 3 4 F
Lebanon Valley LEBANON 1 1 1 1 4
Hood HOOD 0 0 0 0 0

Game Recap: Field Hockey |

Career Day From Long Leads Field Hockey To Big Win At Hood

FREDERICK, Md. – Sorrell Long assisted on the first two goals of the game and then scored in the third quarter to give the Lebanon Valley field hockey team a 4-0 victory at Hood College on Saturday afternoon.
 
The Dutchmen (4-6, 1-1 MAC Commonwealth) scored a goal in each quarter and the defense was spectacular holding the Blazers (3-7, 0-3 MAC Commonwealth) without a shot on goal to earn their first conference win of the season.
 
Inside the Box Score
  • Alana Antonello scored her second goal of the year and fourth of her career 1:45 into the game off an assist by Long.
  • The Dutchmen scored early in the second quarter as Skylar Dise found the back of the cage off a penalty corner attempt for her first goal at LVC. Long once again had the assist on the play.
  • Long added to her career-high two assists with a goal of her own 47 seconds into the third quarter. The goal was her second of the year and third of her career.
  • Elena Tulli scored her second career goal and first of the season in the fourth quarter.
  • LVC outshot the Blazers 22-4 and had a 8-2 advantage in penalty corners.
  • The Dutchmen improved to 10-0 all-time against Hood. 
What's Next
Lebanon Valley will be back in action on Wednesday evening at 7 p.m. with a trip to Huntingdon to take on Juniata College.
 
Stay Connected
Be sure to follow @lvcathletics on Instagram, Twitter, and Facebook for the most in-depth coverage of LVC Athletics.
 
Print Friendly Version